Silicon Enjinering Arahan Pusat

Repeatable IC Design.
Traceable Decisions.
Lebih Pantas Verification.

POWERED BYAINNA NeuralOps

A governed semiconductor intelligence architecture that routes each engineering task to the safest, most repeatable and most compute-efficient processing layer.

Deterministic where possible. AI only where necessary. Manusia-approved where critical.

Tool-AgnosticManusia Sign-OffPenempatan PeribadiVersi ControlledRequirements KebolehkesananAnalogDigitalMixed-SignalMEMSAdvanced Packaging

Enjinering-assisted, human-controlled. Final approval remains with qualified engineers.

AINNA NEURALOPS ORCHESTRATIONWafer intake
Wafer to verified IC floorplan A silicon wafer zooms into one die, then reveals floorplan blocks, signal routes and DesignOps evidence layers. ANALOG FRONT ENDPGA · ADC · SENSOR DIGITAL CORERTL · CONTROL · DSP POWERPMIC · POR · BIAS MEMORYSRAM · OTP · NVM SECURITYROOT · KEYS · DFT I/O & INTERFACESERDES · GPIO · UCIe
RequirementSchematicRTLDRC reportLVS reportTiming reportPVT resultLiputan report
CONTROL LAYERAINNA NeuralOps
Orchestration
Sanitise · Segment · Klasifikasi · Route
Rules + Parsers BYPASS AITempatan Small Model LIGHTWEIGHTAdvanced Model ONLY IF REQUIRED
Independent ValidationEvidence PackEnjiner Sign-Off
WaferDieFloorplanNeuralOpsManusia Authority

Rendaher Hallucination Pendedahan

Kritikal engineering results are parsed, validated and linked to evidence outside the AI model.

Higher Enjinering Repeatability

Design revisions, PDK versions, tool environments, scripts, seeds and evidence remain traceable.

Rendaher Compute Demand

Structured tasks use parsers, rules, cached results and detached services instead of unnecessary large-model execution.

Stronger Kedaulatan Data

Confidential PDK, IP and semiconductor project data can remain within customer-controlled infrastructure.

01

Sanitise

Protect proprietary IC data, PDK information, credentials and engineering context.

02

Segment

Separate requirements, DRC, LVS, timing, coverage, PVT, Monte Carlo and waivers.

03

Parse

Use artefact-specific engineering parsers instead of one general-purpose model.

04

Validate

Check values, units, versions, completeness and specification limits deterministically.

05

Route

Select rules, databases, local models or advanced reasoning by risk and complexity.

06

Assist

Use AI for interpretation, comparison, synthesis and engineering explanation only.

07

Verify

Bandingkan AI-assisted findings against independent evidence and validators.

08

Manusia Sign-Off

Keep architecture, waiver, verification and tape-out authority with engineers.

COMPUTE-EFFICIENT BY ARCHITECTUREFewer unnecessary model calls. Rendaher compute demand. Lagi accountable semiconductor engineering.
Parser-First MemprosesSmall-Model-First PenghalaanGPU Only When RequiredCached Validated KeputusanTempatan Memproses SupportedMeasurable Compute Telemetry
AINNA is the engineering intelligence, orchestration, traceability and repeatability layer around existing semiconductor design alatan.

AINNA does not replace Cadence, Synopsys, Siemens EDA, Ansys, COMSOL or other semiconductor engineering alatan. It connects requirements, workflows, results, decisions and engineering evidence across the IC development lifecycle.

Rendah-Compute Semiconductor Intelligence

NeuralOps for Efficient and Governed Silicon Enjinering

Semiconductor engineering cannot rely on a single probabilistic model. NeuralOps separates deterministic processing, specialised parsing, AI reasoning and human authority into controlled layers.

CONTROLLED PROCESSING ARCHITECTUREAdvanced AI is one routed layer, not the system
01SEMICONDUCTOR ENGINEERING INPUT
02SECURE PROJECT BOUNDARY
03SANITISATION + DATA CLASSIFICATION
04TASK SEGMENTATION
05SPECIALISED ENGINEERING PARSERS
06DETERMINISTIC VALIDATION
07SMART ROUTING
NO MODEL

Rules and Formula Enjins

Timing limits · unit checks · PVT completeness

REUSE

Luluskand Pangkalan Datas and Cached Keputusan

Requirements · validated baselines · prior evidence

CONTROLLED

Detached Enjinering Perkhidmatan

DRC/LVS parsing · manifests · checksums · statistics

LOCAL

Tempatan Small Model

Lightweight classification · metadata · document tagging

SELECTIVE

Advanced Penaakulan Model

Kompleks comparison · ambiguity · synthesis · explanation

INDEPENDENT OUTPUT VALIDATIONEVIDENCE PACKQUALIFIED ENGINEER SIGN-OFF

Semiconductor-Specific Control Map

One Seni Bina. Six Enjinering Domains.

Select a domain to see the bounded NeuralOps controls used around the engineering workflow.

NEURALOPS CONTROLS

Requirements Enjinering

Requirement extraction

Requirement-ID validation

Ambiguity detection

Design-block mapping

Test mapping

Perubahan-impact analysis

Missing-evidence detection

ESG-Aware Silicon Operations

Rendaher-Compute AI for Semiconductor Operations

Simulasi logs, regressions, verification data, DRC/LVS output, timing reports, wafer-test records, yield data, characterisation results and engineering documents are often structured. They should not automatically be sent to a large AI model.

NeuralOps is designed to reduce unnecessary model execution through smart routing, detached processing and specialised parsers.
  1. FirstRules, formulas and deterministic validation
  2. ThenSpecialised parsers and approved databases
  3. ThenCached and previously validated results
  4. ThenSmall local models for lightweight classification
  5. FinallyAdvanced reasoning models only for complex analysis
Fewer unnecessary GPU callsReduced token processingReduced repeated analysisRendaher data-transfer requirementsHigher cache reuseLagi local processingRendaher infrastructure demandLagi predictable compute usageReduced operational wasteImproved auditability

NeuralOps is designed to reduce unnecessary compute consumption by routing work to the lightest validated processing layer capable of completing the task.

GPU-FIRST AI ARCHITECTURE
Every report Large model Large context Repeated generation Manual checking
  • Higher compute demand
  • Greater hallucination surface
  • Weak reproducibility
  • Repeated token processing
  • Lagi external data movement
  • Higher validation burden
AINNA NEURALOPS ARCHITECTURE
Report Sanitise Segment Parse Validate Route AI only where needed Evidence Manusia sign-off
  • Designed for lower unnecessary AI usage
  • Supports predictable processing
  • Stronger evidence traceability
  • Better confidentiality controls
  • Greater output control
  • Designed for lower compute demand

Carbon Claim Readiness

Evidence Level Controls the Bahasa

An estimated result can never be automatically presented as measured or independently verified.

LEVEL 1

Seni Bina Keadaanment

NeuralOps is designed to reduce unnecessary model execution through smart routing, detached processing and specialised parsers.

Published architecture statementSumber: AINNA NeuralOps architecture specification · Last reviewed: 2026-07-29
LEVEL 2

Estimated Projection

Estimated reduction based on configured workload, hardware, routing and grid assumptions.

Estimated Projection - Not a Certified Carbon AuditSumber: AINNA Jejak Karbon Emulator configuration · Last reviewed: 2026-07-29Open Jejak Karbon Emulator
LEVEL 3

Measured Operational Result

Publication blocked until this evidence level passes its governance and approval requirements.

Not available for publicationSumber: Produkion telemetry - not yet connected · Last reviewed: 2026-07-29
LEVEL 4

Verified Independent Claim

Publication blocked until this evidence level passes its governance and approval requirements.

Not available for publicationSumber: Independent assurance - not yet available · Last reviewed: 2026-07-29

Operational Evidence Schema

Semiconductor Compute Telemetry

Operational metadata is stored separately from proprietary design artefacts. ESG measurement does not require collecting schematics, RTL or confidential report content.

event_idproject_idcustomer_environmenttimestamp_starttimestamp_endtask_typeengineering_domainrisk_levelprocessing_routeparser_nameparser_versionmodel_namemodel_sizemodel_locationinput_tokensoutput_tokenscached_tokensgpu_runtime_secondscpu_runtime_secondsmemory_usageestimated_energy_kwhmeasured_energy_kwhenergy_sourcemeter_idmeasurement_sourceevidence_checksumdata_transfer_mbcache_hitdetached_system_usedadvanced_model_usedvalidation_statusresult_statushardware_typehardware_regiondata_centre_puegrid_emission_factorcalculation_methodmethodology_versionexcluded_workloadsconfidence_rangeuncertainty_range
FUTURE-SIAP COMPONENT

NeuralOps Compute and Carbon Evidence Pack

Demonstration DataEstimatedOperationally MeasuredInternally ReviewedIndependently Verified
Measurement periodDefined workloadAI-heavy baselineNeuralOps routing distributionDetached-system workloadParser workloadTempatan-model workloadAdvanced-model workloadModel calls avoidedCache hit rateGPU runtimeCPU runtimeEstimated or measured energyEnergy source or meter identityEvidence checksumPUE assumptionGrid-emission factorEstimated carbon footprintGaris Dasar carbon footprintReduction estimateCalculation methodologyExcluded workloadsKeyakinan and uncertainty rangeAssumptionsLimitationsData completenessKelulusan recordVerification status

Semiconductor ESG and Compute Papan Pemuka

Route-Level Compute Evidence

DEMONSTRATION DATA — NOT MEASURED CUSTOMER PERFORMANCE
Total Enjinering Tugasans10,000
Deterministic Memproses Rate36%
Specialised Parser Rate20%
Detached Perkhidmatan / Pangkalan Data Rate6%
Tempatan-Model Rate11%
Advanced-Model Rate4%
Model Calls AvoidedDemo only
Cache Hit Rate23%
GPU RuntimeDemo only
CPU RuntimeDemo only
Data Transfer AvoidedEstimated
Estimated Energy UsageNot calculated
Estimated Jejak KarbonNot calculated
Garis Dasar PerbandinganConfigure baseline
Estimated ReductionNot calculated
Evidence KelengkapanSeni Bina only

Model the Seni Bina

Bandingkan AI-Heavy and Smart-Routed Memproses

Configure workload, hardware, routing, PUE and grid assumptions before making an unjuran anggaran.

Estimate NeuralOps Impak KarbonExplore AINNA ESG

Carbon metrics disclaimer: Carbon and energy figures shown on this website may be estimates based on configured workload, hardware, PUE and grid-emission assumptions. They are not certified carbon-audit results unless explicitly identified as independently verified. Review assumptions in the Jejak Karbon Emulator.

Enjinering Friction

Semiconductor Enjinering Problems We Solve

Operational problems that slow design closure, weaken evidence and make knowledge difficult to reuse.

01

Fragmented Design Knowledge

Specifications, scripts, simulation settings and rationale are scattered.

Operational impact
Slow onboarding, duplicated investigation and key-person dependency.
AINNA control
Links decisions, artefacts and lessons to controlled design context.
02

Non-Repeatable Enjinering Runs

PDKs, alatan, models, scripts, seeds and environments drift.

Operational impact
Keputusan become difficult to reproduce or compare.
AINNA control
Captures a complete, checksum-aware Run Manifest.
03

Weak Requirements Kebolehkesanan

Requirements are not consistently connected to blocks, tests and evidence.

Operational impact
Perubahan impact and audit readiness remain uncertain.
AINNA control
Maintains requirement-to-evidence traces and missing-test detection.
04

Slow Verification Closure

Failures, coverage gaps, waivers and defects require manual correlation.

Operational impact
Regresi triage consumes senior engineering time.
AINNA control
Clusters failure signatures and exposes closure blockers.
05

Terhad Pengurusan Visibility

Status reports are manually assembled and quickly become stale.

Operational impact
Gate decisions rely on incomplete programme context.
AINNA control
Binas role-aware, evidence-backed readiness dashboards.
06

Lost Pelajariing Between Projects

Resolved issues and design rationale are not retained as reusable knowledge.

Operational impact
Known failures return and reuse risk increases.
AINNA control
Preserves approved patterns, limitations and findings in a Knowledge Vault.

IC Development Lifecycle

From Requirements to Silicon Evidence

Follow one controlled thread from a specification through design, simulation, verification and human sign-off.

Demonstration Data
REQUIREMENTREQ-ANA-0042

Input Noise < 12 nV/√Hz

Operating Temperature: -40°C to 125°C

Verification Required
maps to
DESIGN BLOCKAnalog Front EndOwner: ANA-02 · Rev C7
Sensor
Analog Front End
ADC
Digital Memproses
Interface

Signal intent and interface assumptions remain linked to the requirement baseline.

ANALOG CONTEXT

Rendah-Noise AFE

  • Schematic: afe_top_C7
  • Device parameters: verified
  • PDK reference: validated input required
  • Simulasi setup: noise_corner_v12
DIGITAL CONTEXT

Control RTL

  • Hierarchy: sensor_ctrl
  • Module version: 2.8.1
  • Constraints: ctrl_sdc_19
  • Git commit: 8c2f1e7
  • Owner: RTL-04
always_ff @(posedge clk)
  if (!rst_n) state <= IDLE;
VoltageNoiseClockTemperature response
TT / 0.90 V / 25°C PASSSS / 0.81 V / 125°C PASSFF / 0.99 V / -40°C WARNINGSF / 0.81 V / 85°C FAIL
Functional coverage91%
Code coverage94%
Assertion coverage88%
Requirements coverage86%
Regresi pass rate93%
Open defects14
Waivers7

Regresi failures are grouped into unique signatures before engineering review.

CPU
SRAM
AFE
NoC
I/O
Placement LengkapClock tree CleanCongestion 2 hotspotsIR drop ReviewDRC 2 markersTiming WNS +0.03ns
87%Tape-Out Readiness
RequirementslinkedDesign revisionlinkedSimulasi resultslinkedRun manifestslinkedLiputanlinkedWaiverslinkedFMEAlinkedSign-off checklistlinkedManusia approvalslinked

Controlled Enjinering System

The AINNA IC DesignOps Platform

Modul connect engineering context without replacing qualified engineers or licensed EDA systems.

MODULE 01

Requirements Intelligence

  • Requirement IDs and revisions
  • Ambiguity detection
  • Block, test and evidence mapping
  • Perubahan-impact analysis
  • Missing-test detection
  • Aliran kerja kelulusan
MODULE 02

Enjinering Knowledge Vault

  • Luluskand design patterns
  • Seni Bina decisions
  • Known IP limitations
  • Failure signatures
  • Silicon anomalies
  • Verification templates
  • Foundry clarification
MODULE 03

Design Decision Records

  • Alternatives and rationale
  • Supporting evidence
  • PPA and cost impact
  • Risks and approver
  • Invalidating conditions
MODULE 04

Golden Flow Registry

  • Analog simulation
  • RTL verification and synthesis
  • Timing and physical design
  • DRC, LVS and PEX
  • Kebolehpercayaan and MEMS
  • Tape-out and characterisation
OwnerVersiTool / PDK compatibilityValidation evidenceStatus
MODULE 05

Verification Intelligence

  • Verification-plan tracking
  • Regresi monitoring
  • Failure clustering
  • Liputan closure
  • Waiver and defect aging
  • Readiness gates
MODULE 06

IP Reuse Intelligence

  • Berkelayakan nodes
  • Previous silicon usage
  • Verification status
  • Known issues and dependencies
  • Licensing constraints
  • Reuse readiness and owner
MODULE 07

Design Evidence Pack

  • Requirements baseline
  • Assumptions and constraints
  • Run manifests and reports
  • Liputan, waivers and FMEA
  • CTQ and known limitations
  • Manusia approval and audit trail

Detached · Segmented · Evidence-Bound

AI Must Never Become a Single Point of Enjinering Failure

Semiconductor engineering requires repeatability, traceability and evidence. AINNA NeuralOps separates deterministic engineering processes from probabilistic AI reasoning so that an AI-generated response cannot silently become a design, verification or tape-out decision.

Use advanced AI only when advanced intelligence is genuinely required.

Keep validation-critical work deterministic

Most semiconductor workloads do not require a large language model. Structured and repetitive work belongs in controlled processing layers.

Deterministic rulesSpecialised parsersSchema validatorsMathematical checksVersi-control checksPangkalan Data queriesLuluskand workflow enginesDetached servicesSmall local models where appropriate

Activate advanced reasoning selectively

Model lanjutans are reserved for work where interpretation and synthesis add genuine engineering value.

Kompleks reasoningCross-document interpretationAmbiguity analysisEnjinering comparisonRoot-cause hypothesesKnowledge synthesisManusia-readable explanation

This boundary is designed to reduce unnecessary model calls, token usage, compute demand, latency, cost, power consumption, hallucination exposure and uncontrolled data movement.

AI MAY ASSIST
  • Pengelasan
  • Summarisation
  • Enjinering knowledge retrieval
  • Failure clustering
  • Dokumentasi
  • Requirements interpretation
  • Aliran Kerja recommendations
  • Risk identification
  • Enjinering comparison
  • Draft analysis
AI MUST NOT INDEPENDENTLY
  • Luluskan tape-out
  • Modify a production PDK
  • Perubahan sign-off constraints
  • Luluskan a waiver
  • Release confidential design data
  • Declare a design compliant
  • Declare a verification result valid
  • Alter approved engineering evidence
  • Execute destructive production actions
  • Replace qualified engineer approval
AINNA NEURALOPS CONTROLLED PIPELINEDemonstration Seni Bina Data
01Enjinering Input
02Keselamatan Boundary
03Sanitisation
04Segmentation
05Data Pengelasan
06Specialised Parser
07Deterministic Validation
08Smart Routing
09Detached / Luluskand AI
10Independent Validator
11Evidence Pack
12Manusia Sign-Off
Stage 1 of 12: Enjinering document enters the controlled boundary.
Detached and Deterministic Memproses96%
Advanced AI Required4%

The 96% demonstration share means advanced reasoning models are bypassed; it includes deterministic, cached and customer-controlled local processing and does not claim that every bypassed task is deterministic.

Independent Enjinering Perkhidmatan

Sistem Berasingan

Sistem Berasingan are engineering services that operate independently from the language model. They execute controlled, repeatable and auditable tasks without depending on AI-generated reasoning.

The AI model is not responsible for validating its own output.
CONVENTIONAL AI-FIRST
Enjinering Input Large AI Model AI Interpretation Dijana AI Result Enjiner Retontonan Everything
  • Unnecessary AI dependency
  • High compute usage
  • Difficult repeatability
  • Increased hallucination surface
  • Weak evidence separation
AINNA DETACHED WORKFLOW
Input Sanitisation Segmentation Parser Validation Detached Perkhidmatan AI only when required Kelulusan Manusia
  • Rendaher AI exposure
  • Higher repeatability
  • Better traceability
  • Rendaher compute demand
  • Clear responsibility boundaries
File validationSchema validationPDK-version checksTool-version checksHash verificationRun-manifest generationRequirements ID validationTest-result ingestionLiputan calculationRegresi statusDRC / LVS parsingPVT matrix generationMonte Carlo aggregationStatistical calculationsCapability indicesWafer-map generationEvidence-pack assemblyPermission checksRetention enforcementAudit-log generationKelulusan-state management

Decompose Before Penaakulan

Segmentation Before Intelligence

A request such as “Review this post-layout verification package and determine tape-out readiness” is never sent as one uncontrolled prompt. It becomes bounded tasks with defined inputs, output schemas, allowed alatan, risk, classification, validation, evidence and human gates.

  1. Validate files and formats
  2. Identify project and revision
  3. Confirm PDK and tool versions
  4. Parse DRC results
  5. Parse LVS results
  6. Parse timing results
  7. Parse coverage data
  8. Parse waiver records
  9. Bandingkan against approved limits
  10. Identify missing evidence
  11. Generate technical ringkasan
  12. Route unresolved issues to engineers
L0
Deterministic

File validation, numeric calculation, checksum, lookup

AI not permitted or unnecessary
L1
Rendah-Risk Assisted

Pengelasan, metadata, formatting, basic ringkasan

Parser or small local model preferred
L2
Enjinering Analysis

Ambiguity, failure clustering, cross-report comparison

Evidence-grounded model permitted
L3
High-Risk Decision Support

Waiver, sign-off, safety or reliability analysis

Independent validation and human approval mandatory
L4
Prohibited Autonomi Tindakan

Tape-out, PDK change, production release, destructive action

Autonomi execution prohibited
SEGMENT 09 · APPROVED-LIMIT COMPARISON

Defined inputNormalised timing metrics + REQ-TIM baseline

Hasil schemarequirement_id · value · unit · limit · status

Benarkaned alatanRule engine + approved-limit database

Risk / data classL0 deterministic · Confidential IC

Validation / evidenceUnit check + baseline checksum

Autonomy / approvalBandingkan only · engineer approves disposition

Untrusted by Default

Sanitise Before Memproses

Enjinering data, user instructions, embedded text, external content and system instructions remain separate. Instructions inside uploaded files can never override security, validation or approval rules.

Uploaded FileFile + MIME ValidationMalware / Archive CheckContent ExtractionProm-Injection DetectionConfidentiality PengelasanMetadata NormalisationLuluskand Memproses Zone

PASS Original and sanitised checksums, transformations and policy decision are written to the audit record.

BLOCK / QUARANTINE Invalid, malicious or policy-conflicting content cannot enter the processing zone.

PRIVATE ROUTE Sensitive content remains in the approved private environment, with identifiers minimised and access privileges enforced.

File-size and encoding limitsExecutable and script removalMacro and embedded-object detectionHidden-content inspectionLuaran-link validationSecret and credential detectionPDK and proprietary IP detectionPersonal-data detectionPelanggan-project isolationPeribadi-route policy decision and audit log

Artefact-Specific Extraction

Multiple Specialised Parsers

A single parser creates a single point of failure. Separate parsers handle each engineering artefact and emit defined schemas before outputs can be accepted.

parser_nameparser_versionsource_checksumproject_iddesign_revisiontool_versionmetric_value + unitlimitstatusevidence_locationwarnings
STA TEXT PARSER v2.4WNS = -0.083 nsSumber SHA-256 7F3A… · schema valid
STA TABLE VALIDATOR v1.8WNS = -0.038 nsSumber SHA-256 7F3A… · maths check failed

UNRESOLVED Both outputs preserved. Dependent high-risk actions stopped. Enjiner review required.

Parser disagreement is an engineering signal, not an inconvenience to be hidden.

Independent Checks

Validate Outside the AI Model

Schema, units, ranges, IDs, PVT completeness, mathematics, statistics, versions, duplicate detection, evidence completeness, approved limits and policy are checked independently.

AI STATEMENT
“Semua PVT corners passed.”
INDEPENDENT VALIDATOR
Expected corners
27
Parsed
26
Passed
25
Failed
1
Missing
1
FINAL STATUSAI STATEMENT REJECTEDConflicting and missing deterministic evidence
SchemaUnitsRangeRequirement IDsPVT completenessMathematical reconciliationStatistical consistencyVersi compatibilityCross-file comparisonDuplicatesMissing evidenceGolden flowLuluskand limitsPolicyManusia review

A fluent explanation is not engineering evidence.

Compute-Aware Orchestration

Right Tugasan. Right Model. Right Energy Kos.

Every task is classified by type, complexity, format, confidentiality, risk, required accuracy, latency, reproducibility, compute and energy impact.

Incoming Enjinering TugasanTugasan · Risk · Data Class
Structured CalculationDeterministic Enjin
Report ExtractionSpecialised Parser
Simple PengelasanTempatan Small Model
Cross-Domain AnalysisAdvanced Penaakulan Model
High-Risk DecisionEnjiner Review
Penghalaan priority1. Deterministic execution2. Existing validated result3. Cached approved result4. Specialised parser5. Small local model6. Model lanjutan only when necessary7. Manusia escalation for unresolved risk

Bounded Hasil Keadaans

Hallucination Must Be Contained Before It Reaches Enjinering Decisions

Ketepatan prompting alone is insufficient. Luluskand retrieval, citations, schemas, numerical checks, parser comparison, keyakinan thresholds, contradictions, no-answer states, restricted permissions and immutable audit context reduce exposure.

VerifiedSupportedPartially SupportedConflicting EvidenceInsufficient EvidenceSemakan Manusia RequiredRejected by Validator
AI ANALYSIS STATUSPARTIALLY SUPPORTEDKeyakinan: medium · threshold for readiness: not met
Evidence found
8 linked records · EP-R42-019
Validator
Evidence Gate v3.2 · audit RUN-1142
Missing evidence
Post-layout noise result · One PVT corner · Waiver approval
Permitted action
Generate review ringkasan
Prohibited action
Declare tape-out readiness
INSUFFICIENT VALIDATED EVIDENCE

Sumber-Level Kebolehkesanan

Every Penting Keadaanment Must Point to Evidence

BOUNDED FINDING

Timing requirement REQ-TIM-014 is not satisfied.

Sumber file / locationSTA_Report_R42.txt · line 1842

Checksum7F3A…

ParserSTA Text Parser v2.4

Tool / PDKPrimeTime 2026.03 · PDK R19.2

Design revisionR42

WNS-0.083 ns

Limit≥ 0 ns

CornerSS / 0.81 V / 125°C

ValidationDeterministic parser confirmed

KeyakinanVerified extraction

Audit contextRUN-1142 · 2026-07-29 03:42 UTC

LimitationWaiver state pending

Akaunable Sign-Off

Manusia Authority Remains Mandatory

AINNA supports engineering judgment. It does not replace engineering accountability.

Bantuan AI AnalysisDeterministic ValidationEvidence ReviewBerkelayakan EnjinerDesign AuthorityFinal Kelulusan
ReviewerAssigned qualified engineer
PerananDesign Authority
TarikhPending review
Decision / conditionsNo approval recorded
Supporting evidenceEP-R42-019 · SHA-256 required
Kelulusan signatureCryptographic signature required
Tamat Tempoh / review dateRequired before release
Audit stateImmutable after signature
Seni Bina baselineRequirement changesDesign-rule waiversVerification waiversKebolehpercayaan exceptionsKeselamatan decisionsTape-out readinessProdukion releaseKepatuhan statements

ESG-Aware Computing

Lagi Intelligence With Less Compute

Semiconductor innovation should not depend on sending every task to a large model. Detached services, local models, caching, task segmentation and smart routing reduce unnecessary AI execution.

10,000Incoming engineering tasks
6,200Rules, parsers and detached services
2,300Cached or validated results
1,100Tempatan small models
400Advanced reasoning models
Illustrative Seni Bina Example — Not Measured Pelanggan Prestasi
Detached deterministic servicesSmall-model-first routingTempatan deploymentResult caching and reuseIncremental processingEvent-driven executionKelompok processingDuplicate detectionRetrieval before generationParser-first architectureModel sleep and scale-downCompute-budget limitsCarbon-aware scheduling where availablePerkakasan utilisation monitoring
Total engineering tasks10,000
Tugasans without LLM85%
Small-model tasks11%
Advanced-model tasks4%
Avoided model calls8,500
Estimated compute avoidedDemo only
Estimated energy reductionDemo only
Estimated carbon reductionDemo only
Cache hit rate23%
Tempatan processing rate96%
Data-transfer reductionEstimated
Estimation methodology and boundaries

Public figures use a 10,000-task illustrative baseline, classify deterministic and cached handling before model routing, and do not assume a production model, hardware platform, grid carbon factor or measured period. Actual telemetry must record model type, hardware, duration, energy source, cache policy, data transfer and keyakinan range.

ESG metrics must be calculated from actual deployment telemetry. Public website values are demonstration data unless explicitly supported by measured operational records.

Rendah-Power Tempatan Execution

Kedaulatan Data Controls the Route

Tempatan execution can reduce external transfer and latency while improving control over PDK, IP and compute usage.

Confidential PDK or proprietary IC dataTempatan or customer-controlled environment only
Pelanggan on-premisesPeribadi VPCAir-gapped assessmentTempatan LLM serverTempatan small modelsPelanggan-approved external modelHybrid routing
Reduced external data transferRendaher latencyImproved confidentialityControl over PDK and IP dataSmaller model selectionPredictable compute usageReduced hyperscale dependency

Luaran routing requires explicit customer approval, appropriate sanitisation, policy compliance, audit logging and an approved destination.

Seni Bina Operations

Sistem Berasingan Papan Pemuka

Demonstration Data · Illustrative 10,000-task period · Updated 29 Jul 2026

Workload Distribution

Deterministic36%
Parser20%
Detached services / database6%
Cached results23%
Tempatan model11%
Model lanjutan4%
Kategori jumlah 100% and reconcile to the illustrative task funnel. Manusia review is tracked separately.

Validation Status

Verified outputs8,412
Rejected outputs43
Parser conflicts17
Insufficient evidence84
Manusia review pending29
Policy-blocked actions12

Hallucination Containment

Unsupported claims blocked31
Missing citations52
Numerical inconsistencies14
Model contradictions9
Hasils escalated47
Prohibited actions prevented12

ESG Operations

Model calls avoided8,500
Cache hit rate23%
Tempatan processing96%
Compute reductionEstimated
Energy reductionEstimated
Data-transfer reductionEstimated

Run Konteks Integrity

Repeatable Semiconductor Enjinering

Repeatability requires more than storing the final simulation report. A reproducible run must preserve the complete design, tool, model, script, configuration and computing context.

AINNA Repeatable Run ManifestMANIFEST-ANA-114
Project IDSENSOR-AFE-24
Design revisionC7
Git commit8c2f1e7
Perforce revisionCL 28419
IP versionafe_ip 3.4
PDK versionValidated input only
Model librarymodels_2026.07
EDA toolPelanggan-approved simulator
EDA / patch versionCaptured
Script versionnoise_run_v12
Testbench revisiontb_ana_42
Constraint filessha256 verified
Configuration filessha256 verified
PVT cornerSF / 0.81 V / 85°C
Monte Carlo seed842191
Solver settingsCaptured
Input checksums17 verified
Compute environmentcluster-a17
Operating systemEnterprise Linux
Run ownerANA-02
Timestamp2026-07-29 02:14 UTC
Expected outputInput noise spectrum
Accepted tolerance≤ 12 nV/√Hz
Kelulusan statusReview required
Waiver statusNone

Visual demonstration only. No EDA simulation is executed.

Verification Intelligence

Trace the Requirement. Reproduce the Result. Close the Evidence.

Interactive demonstration data connects requirement intent to technical evidence and failure context.

Demonstration Data — Not Pelanggan Prestasi
Requirement revision Rev 4Owner PWR-03Status LuluskandAffected blocks PMIC, PORLinked tests 4Evidence files 7
PVT Corner Matriks12 RUNS
REQ-ANA-0042 · Manifest MANIFEST-ANA-114
Monte Carlo Yield5,000 SAMPLES
98.4%Estimated Yield1.82 mVMean Offset4.91 mV3σ Limit17Outliers
923Regresi Failures
7Unique Signatures
3Root Causes
2Environment Issues
1RTL Issue
1Testbench Issue
1Unresolved
SignatureTestsFirst / LastSuspected sourceOwnerStatus
SIG-CLK-0731202:11 / 06:42EnvironmentCAD-02Resolved
SIG-RST-0318402:14 / 06:39RTLRTL-04Review
SIG-TB-1112702:18 / 06:37TestbenchVER-07Fix queued
SIG-X-194103:22 / 06:12UnresolvedVER-03Open

Design for Six Sigma

Design for Six Sigma in Semiconductor Enjinering

DMAIC improves existing engineering or manufacturing processes. DMADV structures baharu product and IC development.

Demonstration Data — Not Pelanggan Prestasi
DMAIC

Define · Measure · Analyze · Improve · Control

DMADV

Define · Measure · Analyze · Design · Verify

  • Voice of Pelanggan
  • System and regulatory requirements
  • PPA, cost and CTQs
CTQ baseline
  • CTQ limits
  • Existing IP capability
  • Measurement uncertainty
  • Defect escape baseline
Measurement plan
  • Seni Bina trade-off
  • Sensitivity and DOE
  • Design FMEA
  • Risk prioritisation
Dagangan study
  • Robust design
  • PVT and Monte Carlo
  • DFT, DFM and reliability
  • Verification strategy
Design evidence
  • Requirement coverage
  • DRC, LVS and PEX
  • Silicon correlation
  • Control plan
Sign-off package

CTQ & Capability

Input noiseTarget 12 nV/√HzSemasa 10.8 · Margin 10% · PASS
Cp 1.52Cpk 1.34Pp 1.41Ppk 1.2795% CI 1.18–1.36Kestabilan Review

Capability indices should only be interpreted after validating process stability, sampling suitability and data distribution.

SPC & Measurement System

RepeatabilitytrackedReproducibilitytrackedBiastrackedKestabilantrackedLinearitytrackedGauge R&RtrackedTester correlationtrackedSimulasi-to-silicontracked

DOE & Design FMEA

Bias currentDevice widthCompensation CTemperatureInteraction A×B
AFE saturationKeterukan 8Occurrence 3Detection 4Owner ANA-02Evidence pending

Peranan-Aware Programme Intelligence

Enjinering Papan Pemukas

Evidence-backed tontonan for executives, engineering disciplines, repeatability, verification and silicon learning.

Semua Figures Are Demonstration Data
Seni Bina gate82%
Design completion15
Verification closure+5.2%
Tape-out readiness10
Kritikal risks86%
Jadual variance19
Enjinering workload+9.2%
Compute utilisation14
Seni Bina gate trend
PPA trendmonitoredBlock readiness heatmapmonitoredEvidence freshness< 15 minGate blockers3 review
Wafer Yield MapDEMONSTRATION DATA
PassMarginalFailNo data

Enjinering Peranans and Programmes

IC DesignOps by Peranan and Use Case

Select a role to see the workflow, dashboard and operational benefit most relevant to that team.

PRIMARY WORKFLOW

Programme gate readiness

Sambung architecture, block status, verification closure and technical risk to current engineering evidence.

Papan Pemuka: Executive Programme
Benefit: Improved verification visibility and reduced manual coordination.
01

Analog front end

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Reduced manual coordination.
02

Power management IC

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Improved traceability.
03

Automotif sensor interface

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Lebih Pantas failure triage.
04

RISC-V subsystem

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Higher run reproducibility.
05

AI accelerator

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Better engineering knowledge retention.
06

Mixed-signal data converter

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Improved verification visibility.
07

RF front end

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Reduced manual coordination.
08

SerDes

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Improved traceability.
09

Keselamatan IP

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Lebih Pantas failure triage.
10

Chiplet

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Higher run reproducibility.
11

UCIe interface

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Better engineering knowledge retention.
12

Advanced packaging

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Improved verification visibility.
13

FPGA-to-ASIC migration

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Reduced manual coordination.
14

MEMS inertial sensor

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Improved traceability.
15

Sensor fusion

  1. Problem: Distributed requirements and inconsistent run context.
  2. Semasa workflow: Manual handoffs across alatan, reports and teams.
  3. AINNA workflow: Controlled manifest, trace links and evidence gates.
  4. Evidence: Run context, verification result, decision and approval.
  5. Expected outcome: Lebih Pantas failure triage.

Kedaulatan Data

Enjinering Konteks Stays Inside the Luluskand Boundary

Public demonstrations and enterprise deployment are deliberately separated.

PUBLIC

Demonstration Environment

  • Sanitised data
  • Demonstration PDK context
  • Public examples
  • No proprietary IP
  • No confidential customer designs
PRIVATE

Enterprise Environment

  • Pelanggan-controlled infrastructure
  • Peribadi VPC, on-premises or assessed air-gapped option
  • PDK isolation and role-based access
  • Encryption and audit-trail controls
  • Tempatan or bring-your-own-model deployment option
  • Controlled retention and deletion policies
Pelanggan IP Boundary

Public demonstrations use sanitised data. Produkion PDKs, proprietary IP, design databases and customer engineering information remain inside the customer-controlled environment. Pelaksanaan controls and air-gap suitability are validated per customer architecture, security policy and contract.

Open Authenticated Enterprise Demo

Tool-Agnostic Sambungivity

Sambung the Enjinering Konteks Around Existing Alat

Designed to connect through approved APIs, scripts, reports, schedulers, version-control systems and engineering data exports.

EDA & Enjinering

CadenceSynopsysSiemens EDAAnsysCOMSOLKeysightMATLABSimulink

Versi Control

GitGitHubGitLabPerforce

Requirements & Lifecycle

PolarionJamaJiraIBM Enjinering Requirements PengurusanPLM systems

Automasi & Compute

JenkinsGitLab CISlurmLSFKubernetesInternal job schedulers

Enjinering Data

CSVJSONXMLREST APILogsSimulasi reportsLiputan databasesTest dataWafer maps

Integration availability depends on tool licensing, customer environment, Akses API and approved security policies. Vendor names identify ecosystem context and do not imply certified integration.

Preserved Enjinering Content

Enjinering Sumber

The original semiconductor briefing and prompt material now supports the platform as practical engineering intake templates.

RESOURCE 01

Enjinering Prom Perpustakaan

Structured prompts for architecture, power, verification and review.

RESOURCE 02

IC Design Briefing Rangka Kerja

Six controlled inputs: design type, implementation strategy, interface, power, validated tool context and required artefacts.

RESOURCE 03

Analog Design Input Template

Specification, PVT, noise, device model, simulation and evidence fields.

RESOURCE 04

Digital Design Input Template

RTL hierarchy, constraints, commit, owner, verification and sign-off context.

RESOURCE 05

Verification Input Template

Pelan, tests, seeds, environment, coverage, waivers and defect context.

RESOURCE 06

MEMS Input Template

Sensor mechanism, multiphysics context, interface, characterisation and calibration.

RESOURCE 07

Tape-Out Review Template

Evidence baseline, run manifests, DRC/LVS/PEX, waivers and human approvals.

RESOURCE 08

Failure Analysis Template

Signature, affected tests, first occurrence, source hypothesis, owner and resolution evidence.

ENGINEERING TEMPLATE

Controlled use

Do not place NDA-restricted PDK content, proprietary schematics, export-controlled data, customer requirements or unreleased IP into a public AI service. AINNA outputs are engineering drafts and evidence aids. PDK-aware operation requires validated, authorised inputs. Berkelayakan engineers retain design, verification and tape-out authority.

Scoped Evaluation

Start a Controlled IC DesignOps Perintis

Begin with one bounded engineering workflow, agreed evidence boundaries and human-controlled success criteria.

Live Enjinering Konteks

Semiconductor Intelligence Brief

Selected developments in semiconductor technology, IC design, EDA, verification, advanced packaging and Malaysia’s semiconductor ecosystem, with concise explanations of their relevance to engineering teams.

Loading approved semiconductor sources...