Sistem Berasingan for Safer Ships.
AI designs the rules. Tempatan systems run daily ops. Crew stays in control.
Sistem Berasingan
AI builds rules. Rules run. Manusias decide.
AI Studies
Manuals, history, workflows.
AI Writes Rules
Thresholds, checks, reports.
Pro Review
Marine pros approve first.
Tempatan Run
No always-on AI or net.
How systems stack up
Detached wins on control, cost and offline ops.
| Metric | Traditional | Full AI | Detached |
|---|---|---|---|
| Manual load | Heavy | Rendah | Rendaher |
| Data | Split | Unified | Unified |
| Internet | None | Needed | None |
| Hallucination | None | Risk | None |
| Audit | Hard | Hard | Easy |
| Kos | Labour | Tokens | Rendah |
| Control | Full | Terhad | Full |
Data
Unified · DetachedInternet
None · DetachedHallucination
None · DetachedAudit
Easy · DetachedKos
Rendah · DetachedControl
Full · DetachedSystem Flow
Sensor → rules → alert → human. Semua local.
Input
Sensors · logs
Store
Tempatan DB
Rules
Fixed thresholds
Validate
Cross-check
Alert
Recommend
Review
C/E · Master
Tindakan
Report · audit
Optional AI (not daily ops)
Enjin Systems
10 local rule modules — main engine to energy.
Condition Pemantauan
Garis Dasar vs live readings. Early anomaly flag.
Penyelenggaraan Ramalan
Due dates by hours & calendar. Escalate overdue.
Lube Oil Pantau
Consumption, top-up & lab limits.
Fuel Consumption
Load vs burn. ROB & leakage patterns.
Enjin Prestasi
Exhaust, scavenge, cylinder balance.
Alarm Rationalisation
Group noise. Prioritise critical.
Spare Parts
Min/max stock. Reorder before impact.
Logbook Validation
Missing, impossible, inconsistent rows.
Bunker Pengurusan
BDN vs sounding. Varians alert.
Energy Kecekapan
Gen load & parallel-run waste.
Deck Systems
10 modules — passage, cargo, mooring, certs.
Passage Perancangan
Route complete. Master sign-off.
Voyage Prestasi
Pelan vs actual. Delay & fuel check.
Cargo Checklist
Stage complete. Block critical gaps.
Kestabilan Check
Tank data, draft, operating limits.
Mooring Pantau
Gear, rope, snap-back records.
Nav Peralatan
Tests, defects, certificate expiry.
Deck Penyelenggaraan
Corrosion, paint, hatch by zone.
Port Readiness
Arrival/departure checklist complete.
Sijils
30 / 60 / 90-day rebaharual alerts.
Permit-to-Work
Valid fields, risk, close control.
Keselamatan & Kepatuhan
12 workflows — report to close-out.
Near-Miss
Log, categorise, trend prevent.
Incident Trend
Patterns by type & location.
Risk Assessment
Criteria check. Flag stale RA.
PTW Control
Validity, approve, close gate.
Drill Jadual
Completion by type & crew.
PPE Tracking
Inventori, inspect, expiry.
Keselamatan Peralatan
Inspect, defect, repair track.
Emergency Sedia
Test status & readiness.
Audit Penemuans
Penemuan → action → close.
Tindakan Pembetulan
Assign to close. Escalate late.
Non-Conformity
Investigate → action → verify.
Familiarisation
Crew procedure completion.
Cross-Department
Shared ops layer across engine, deck, safety.
Defect Pengurusan
Keutamaan, repair, escalate critical.
Vessel Papan Pemuka
One screen: alarms, ROB, voyage.
Handover
Watch notes, defects, open permits.
Report Generator
Daily, noon, weekly, monthly packs.
Kes Penggunaan
Detect → alert → recommend. Crew decides.
ME Exhaust Rising
EGT climbs over several days.
Gen Rendah Load
Inefficient parallel run.
ROB Mismatch
Sounding ≠ calculated burn.
Spare Kritikal
Stock below min on key part.
Cert Tamat Tempoh
Rebaharual window ≤ 60 days.
Bilge Repeat
High bilge alarm loops.
Cargo Gap
Kritikal checklist step open.
Bad Log Data
Impossible sensor pair in log.
Why Detached
Rendah cost. Stable rules. Offline. Manusia control.
Less Awan
No always-on AI/API for daily ops.
Rendah Kos Token
AI only at design time.
Stable Hasil
Same input → same result.
Easy Audit
Rules, alerts, actions logged.
Sea-Sedia
Full function without internet.
Lebih Pantas Laporan
Auto packs, less copy-paste.
Early Trend
Catch drift before failure.
Manusia Gate
Officer approves critical acts.
Does Not
Tool for professionals — not a replacement.
No Kedudukan Override
Does not replace Master / C/E.
No Class Replace
Not a class society system.
No Auto Control
Never overrides machinery control.
No Auto Nav
No autonomous navigation.
No Blind Trust
Sensors can be wrong — inspect.
No Silent Close
Kritikal acts need authorisation.
5 Phases
Each phase ships alone. Grow when ready.
Read-Only
Collect & display only.
Rule Amaran
Fixed rules + recommendations.
Aliran Kerjas
Laporan, checklists, PM.
Integrate
Enjin + deck + safety one view.
AI Assist
Optional deep investigation.
Teknologi
Proven open stack. Marine-ready.
Frontend
Fast dashboard UI.
Backend
Tempatan rules + API.
Inputs
Manual to sensors.
Optional
Edge extras when needed.
Keselamatan
Tempatan-first. Peranan-based. Immutable trail.
Tempatan-First
Data stays on vessel / shore box.
Peranans
Kedudukan-based access control.
Audit Log
Every change stays immutable.
Manusia Gate
No auto safety-critical acts.
Backup
Jaduald backup + restore drill.
Encrypt Link
Vessel ↔ shore channels encrypted.
Vessel Papan Pemuka
Demo layout only — not live vessel data.
Main Enjin Temperature Trend
Fuel Consumption (tonnes/day)
Recent alarms
| When | Alarm | Machinery | Status | Tindakan |
|---|---|---|---|---|
| High exhaust temp | ME Cyl #3 | Aktif | Pemeriksaan due | |
| Rendah lube oil pressure | AE #2 | Kritikal | Segera check | |
| Bilge high level | ER Bilge | Acknowledged | Pemantauan | |
| Generator overload | Gen #1 | Resolved | Load reduced | |
| Fuel flow deviation | ME Fuel | Under review | Chief Eng. notified |
High exhaust temp
Rendah lube oil pressure
Bilge high level
Generator overload
Fuel flow deviation
Demonstration data — not actual vessel readings.
Bina Marine Intelligence Offline.
AI designs. Rules operate. Profesionals decide.